Quality Control

Motilal has the most amplified and nitty gritty control estimation frameworks in its class, rendering it the most noteworthy quality firm in the area. With this beginning stage, every phase of the organization commits itself to giving the need totally and on properly time. The quality is kept up through every office by regarding its second rate as a client and adjustment of all standards to the staff in periodical trainings. From an organized perspective, Motilal regards its client as a purchaser of all items and administrations in its inside and outer exercises.

As a way to provide providers of good quality and unconditional customer happiness, the quality principles have to be assimilated with each department with the company, quality comprehension of Motilal comprehends many activities as well as decision processes linked to raw components to products and many external offer focus. Quality comprehension of Motilal depends on continual recoveries. Therefore customers are offered with a complete integrated quality service.

Motilal does not permit the aggregate quality framework be represented by the administration division alone. Rather Motilal acknowledges that it is a typical objective of the considerable number of representatives and supplying firms. Motilal as an aftereffect of its aggregate quality comprehension, make up for lost time universal quality models and has been allowed heaps of worldwide quality testaments like:

  • ISO 9001 – 2008

Controls & Tests:
The Controls; are performed by, in the accountability with this Motilal's Quality Manage Department independent of manufacturing to ensure that all required programs are executed. For the purpose our excellent control personnels provide equipments and as well knowledge. Motilal's possesses numerous,templates and devices for excellent control and tests. The reliability of those templates, equipments and equipment are inspected and calibrated over the internationally accredited businesses. If requested, controls can be performed by way of a third part assessment company.
On the off chance that asked for, the accompanying tests and controls can be performed:

Destructive Tests
  • Tensile Tests for High and Low Temperatures
  • Bending Test
  • Charpy Impact Test At Each Temperature
  • Surface Hardness Test
  • Macro and Micro-graphic Tests
Non – Destructive Tests:
  • Dimensional Tests (DT)
  • Thickness Measurement
  • Radiographic Test (RT)
  • Ultrasonic Test (UT)
  • Magnetic Particules Test (MT)
  • Dye-Penetrant Test (PT)
  • Delta Ferrite Test
  • Surface Rougness Test

Non-destructive tests are performed by qualified Level 2 and Level 3 NDT personnel in accordance with EN 473 and ASNT TC1 –A.

CERTIFICATES PRESENTED WITH THE DISHED ENDS

If requested the following inspection and test certificates can be obtained; Materials

  • Material Certificate EN 10204 : 3.1
  • HIC Test Nace Mr 0175 – ISO 15156 – 2
  • Certificate of Non-Radioactivity
  • Lamination Test Report EN 10160-ASME Sec. II SA 435-Sa 578
  • Mechanical Test Reports
Dished Ends:
  • Dish End Certificate EN 10204 : 3.1
  • Thickness and Dimensional Control Report
  • WPS – PQR – Welder Certificate
  • Heat Treatment Report
  • Radiographic Test Report
  • Ultrasonic Test Report
  • Magnetic Particles Test Report
  • Dye- Penetrant Test Report
Heat Treatments:

Various process of heat treatments are conducted.

  • Stress Relieving
  • Normalising
  • Annealing
  • Tempering

The particular natural portion of Cold Developing, Heat Treatment Furnaces of MOTILAL are approved simply by TUV. MOTILAL can fulfill all sorts of issue defined simply by international standards for, Metal Austenitic, As well as Steel, Duplex, Super Duplex Kinds are according to the worldwide standards. MOTILAL Heat treatment furnaces are inspected along with calibration as per API-6A NORMS.

Our brand-new heat treatment furnaces joined into service with dimention of 3.5*2*2.5 Meter Height. The central heat temperature is measured simply by Ni-Cr-Ni (double elements) thermocouples according to IEC 584 standard at six to eight zone. We are able to also connect multiple thermocouples for the workpiece with heat treatment. All heat and occasion controls are performed simply by SIEMENS S7-300 PLC control system.